Our Projects:

















































*  Panama Road, MOUNT WELLINGTON


Kerbside length on the front yard would not have enough space for all bins to be placed hence requesting a quote/report from private waste collection company regarding types and quantity of waste.  

* Beach Road, LONG BAY

Using different colours of concrete to enchance and visualise pedestrian path while maximising safeness for residents within the site. 

* The Close, GREENHITHE


Redesign native forest control area.


Planting restoration. 




Copyright @ 2023 GUC Consultants Limited. All rights reserved. 

GUC

GUC

*  Fulton Crescent, OTARA


10m set back.


Planting restoration for apartment zone.

* Beach Road, TE ATATU PENINSULA

In collaboration with the lighting company to complete lighting compliance report.

During landscaping initial design, taking into account to ensure sufficient space for lights installation, location and types.

* Wilks Road, DAIRY FLAT

To mitigate the visual dominance impact, a row of plants is introduced along the west boundary of the site providing a screen from streetscape by landscaping. 

Reduce visualisation impact for neighbourhood. 
*Landscape Assessment Report provided

GUC